top of page

PORTFOLIO

Bolton Middlebrook 398

July 2018

  • The unit was designed by Next in collaboration with the LL developer to our requirements.

 

  • An internal gross footprint of 29,000 sq ft increased to 53,000 sq ft with the installation of a lightweight mezzanine structure.

 

  • Installation of 2no 21person lifts, 2no escalators and 3no glass staircases. Along with mezz edge structural glass, sprinkler system including tank & pump house.

 

  • The fit out also included the installation of HVAC equipment, electrical works and finishes including ceramic floor tiles, mosaic floor tiles timber flooring, wall finishes such as polished plaster.

 

  • After the 20 week fit out programme the merchandise equipment be will ready in place for the store team 

Sheffield St James Park 056

July 2018

  • The unit was designed by Next in collaboration with the LL developer to our requirements.

 

  • An internal gross footprint of 11,000 sq ft increased to 20,000 sq ft with the installation of a lightweight mezzanine structure.

 

  • Installation of a 21 person lift and a glass staircase. Along with mezz edge structural glass.

 

  • The fit out also included the installation of HVAC equipment, electrical works and finishes including ceramic floor tiles, mosaic floor tiles timber flooring, wall finishes such as polished plaster.

 

  • With a fit out programme of 12 weeks.

Durham  Arnison  018

November 2017

  • Installation of a 21 person lift and a glass staircase. Along with mezz edge structural glass. The unit was designed by Next in collaboration with the LL developer to our requirements.

 

  • An internal gross footprint of 25,000 sq ft increased to 46,000 sq ft with the installation of a lightweight mezzanine structure.

 

  • Installation of 2no 21 person lifts, an escalator and 2no glass staircases. Along with mezz edge structural glass.

 

  • The fit out also included the installation of HVAC equipment, electrical works and finishes including ceramic floor tiles, mosaic floor tiles timber flooring, wall finishes such polished plaster.

 

  • 17 week fit out programme

Banbury Gateway 596

February 2016

  • The unit was designed by Next in collaboration with the LL developer to our requirements.

 

  • An internal gross footprint of 21,000 sq ft increased to 39,000 sq ft with the installation of a lightweight mezzanine structure.

 

  • Installation of 2no 21 person lifts and 2no glass staircases. Along with mezz edge structural glass.

 

  • The fit out also included the installation of HVAC equipment, electrical works and finishes including ceramic floor tiles, mosaic floor tiles timber flooring, wall finishes such polished plaster.

 

  • 17 week fit out programme

Rugby Elliotts Field 504

July 2015

  • The unit was designed by Next in collaboration with the LL developer to our requirements.

 

  • An internal gross footprint of 15,000 sq ft increased to 28,000 sq ft with the installation of a lightweight mezzanine structure.

 

  • Installation of a 21 person lift, a 13 person glass lift, escalator and a glass staircase. Along with mezz edge structural glass.

 

  • The fit out also included the installation of HVAC equipment, electrical works and finishes including ceramic floor tiles, mosaic floor tiles timber flooring, wall finishes such as polished plaster.

 

  • 12 week fit out programme

Cambridge Old Shopfront

Cambridge Old Shopfront

Cambridge Women's Casual

Cambridge Women's Casual

Cambridge Women's Shoe Dept.

Cambridge Women's Shoe Dept.

Cambridge Women's Shoe Dept. 01

Cambridge Women's Shoe Dept. 01

Cambridge Women's Cashdesk

Cambridge Women's Cashdesk

Cambridge Men's Cashdesk

Cambridge Men's Cashdesk

Cambridge Men's Casual

Cambridge Men's Casual

Cambridge Mens Formal

Cambridge Mens Formal

Cambridge Sidney St 569
Pre-Refit

Cambridge Sidney Street store was previously trading as Woolworth until Next took possession and opened in early 2000.  Although the store had gone through minor cosmetic works over the years, in early 2015 it had been decided to increase the cosmetic budget to £1.3m and give the store a complete overhaul with the majority of the spend used to redesign the existing shopfront and the Women's department on the ground floor.

Cambridge New Shopfront

Cambridge New Shopfront

Cambridge Women's Cashdesk

Cambridge Women's Cashdesk

Cambridge Women's Formal Dept.

Cambridge Women's Formal Dept.

Cambridge Women's Casual Dept.

Cambridge Women's Casual Dept.

Cambridge Women's Casual Dept. 01

Cambridge Women's Casual Dept. 01

Cambridge Women's Casual Dept. 02

Cambridge Women's Casual Dept. 02

Cambridge Men's Casual Dept.

Cambridge Men's Casual Dept.

Cambridge Men's Shoe Dept.

Cambridge Men's Shoe Dept.

Cambridge Sidney St 569
Post Refit

The Cambridge store relaunched in April 2016 in time for the very busy Easter period, with a transformed presence on the high street. With new shopfront and Women's department, complete with plasterboard ceilings, wall finishes, ceramic and timber floor finishes. With 12 week programme and budget of £1.3m, the store has become an asset to the brand and to the local high st.

Northampton Old Shopfront

Northampton Old Shopfront

Northampton Womens Casual Dept

Northampton Womens Casual Dept

Northampton Women's Formal Dept.

Northampton Women's Formal Dept.

Northampton Women's Shoe Dept.

Northampton Women's Shoe Dept.

Northampton Men's Dept.

Northampton Men's Dept.

Northampton Children's Dept.

Northampton Children's Dept.

Northampton Home Dept.

Northampton Home Dept.

Northampton Lighting Dept

Northampton Lighting Dept

Northampton Riverside 591
Pre-Refit

With the current sales figures outperforming the existing ground floor sales space. When the opportunity of utilising the adjacent vacant JJB unit, to expand the store into much needed sales space, this was not to be missed. The 28 week programme was set to start in late 2013 with a capex value of £4.89m.

Northampton New Shopfront

Northampton New Shopfront

Northampton Entrance Atrium

Northampton Entrance Atrium

Northampton Women's Shoe Dept.

Northampton Women's Shoe Dept.

Northampton Women's Casual Dept.

Northampton Women's Casual Dept.

Northampton Children's Dept.

Northampton Children's Dept.

Northampton Menswear Dept.

Northampton Menswear Dept.

Northampton Lighting Dept.

Northampton Lighting Dept.

Northampton Home Dept.

Northampton Home Dept.

Northampton Riverside 591
Post Refit

The new store launched with the Fashion side opening in April  2014 and the Home floor during the following month. Keeping the brick pilasters and introducing the new frameless glass shopfront brought the store design right up to date. Extending the partial mezzanine floor to almost full cover, excluding the front and middle atrium. Adding roof lights and large windows to the rear of the store to let in as much natural light as possible to give the store a feeling of openness that was lacking in its previous guise. Installation of a new escalator, 2no new glass staircases and a new 21 person goods lift and a glass-sided 21 person customer lift.

bottom of page